4CRM

Cryo-EM of a pre-recycling complex with eRF1 and ABCE1


Changes made to a PDB entry after its initial release are considered to be either “major” or “minor”. The latest minor version of each major version is available as a file download. More information about the PDB versioning is available.


Version NumberVersion DateVersion Type/Reason Version ChangeRevised CIF Category
1.02014-07-23Initial release
1.12016-05-11Structure summary
1.22017-08-30Data collectionem_image_scans, em_software
1.32019-11-20Advisory, Derived calculationsdatabase_PDB_caveat, pdbx_struct_conn_angle, pdbx_validate_close_contact, struct_conn Download