4WBS | pdb_00004wbs

Crystal structure of an ABC transporter related protein from Burkholderia phymatum


Experimental Data Snapshot

  • Method: X-RAY DIFFRACTION
  • Resolution: 2.00 Å
  • R-Value Free: 
    0.237 (Depositor), 0.240 (DCC) 
  • R-Value Work: 
    0.183 (Depositor), 0.189 (DCC) 
  • R-Value Observed: 
    0.186 (Depositor) 

Starting Model: experimental
View more details

wwPDB Validation   3D Report Full Report


This is version 1.3 of the entry. See complete history


Literature

Crystal structure of an ABC transporter related protein from Burkholderia phymatum

Seattle Structural Genomics Center for Infectious Disease (SSGCID)Abendroth, J.Clifton, M.C.Sankaran, B.Lorimer, D.Edwards, T.E.

To be published.

Macromolecules
Find similar proteins by:  (by identity cutoff)  |  3D Structure
Entity ID: 1
MoleculeChains Sequence LengthOrganismDetailsImage
ABC transporter related
A, B
282Paraburkholderia phymatum STM815Mutation(s): 0 
Gene Names: Bphy_0327
UniProt
Find proteins for B2JCQ1 (Paraburkholderia phymatum (strain DSM 17167 / CIP 108236 / LMG 21445 / STM815))
Explore B2JCQ1 
Go to UniProtKB:  B2JCQ1
Entity Groups  
Sequence Clusters30% Identity50% Identity70% Identity90% Identity95% Identity100% Identity
UniProt GroupB2JCQ1
Sequence Annotations
Expand
  • Reference Sequence
Experimental Data & Validation

Experimental Data

  • Method: X-RAY DIFFRACTION
  • Resolution: 2.00 Å
  • R-Value Free:  0.237 (Depositor), 0.240 (DCC) 
  • R-Value Work:  0.183 (Depositor), 0.189 (DCC) 
  • R-Value Observed: 0.186 (Depositor) 
Space Group: P 21 21 21
Unit Cell:
Length ( Å )Angle ( ˚ )
a = 54.07α = 90
b = 79.85β = 90
c = 121.14γ = 90
Software Package:
Software NamePurpose
XDSdata reduction
BALBESphasing
PHASERphasing
PHENIXrefinement
PDB_EXTRACTdata extraction
XSCALEdata scaling

Structure Validation

View Full Validation Report



Entry History 

Deposition Data

Revision History  (Full details and data files)

  • Version 1.0: 2014-09-24
    Type: Initial release
  • Version 1.1: 2015-02-04
    Changes: Derived calculations
  • Version 1.2: 2017-11-22
    Changes: Derived calculations, Other, Refinement description, Source and taxonomy, Structure summary
  • Version 1.3: 2023-09-27
    Changes: Data collection, Database references, Refinement description